RESERVES AND PRODUCTION

The Akzhal orebody was discovered in 1880, exploration at Akzhal began in 1935. Large scale mining started with the development of an open pit mine and a 600,000 tpa concentrator in 1951. The present concentrator now has a nominal capacity of 1.2Mtpa.  Originally built in 1986, the plant capacity has been augmented with a heavy medium plant in 2001 and replacement grinding mills in 2005.

The extraction of ores from Akzhal mine is currently conducted by open-pit mining operations at its Central Pit. The mine also contains a second pit, referred to as the East Pit.  

The Mineral Resource and Ore Reserve Statements of Nova Zinc have been produced by U.K.-based SRK Consulting, classified in accordance with the JORC Code.

 

Mineral Resource Statement as at 1 January 2006

 

  Tonnage
(Mt)
Zinc (Zn)
(%)
Zn
(Kt)
Lead (Pb)
(%)
Pb
(t)
Central Pit          
Indicated 10.4 4.1 420 0.5 52
Inferred - - - - -
Sub-total 10.4 4.1 420 0.5 52
Underground Project          
Indicated - - - - -
Inferred 11.1 3.9 438 1.3 147
Sub-total 11.1 3.9 438 1.3 147
Surface Stockpits          
Indicated 2.6 1.3 34 0.2 4
Inferred - - - - -
Sub-total 2.6 1.3 34 0.2 4
All Sources - - - - -
Indicated 13.0 3.5 454 0.4 56
Inferred 11.1 3.9 438 1.3 147
Grand Total 24.1 3.7 892 0.8 203

 

Ore Reserve Statement as at 1 January 2006

 

  Tonnage
(Mt)
Zinc (Zn)
(%)
Zn
(Kt)
Lead (Pb)
(%)
Pb
(t)
Central Pit          
Probable 11.0 3.7 405 0.5 50
Итого 11.0 3.7 405 0.5 50
Surface Stockpiles          
Probable 2.6 1.3 34 0.2 4
Sub-total 2.6 1.3 34 0.2 4
All Sources          
Probable 13.6 3.2 439 0.4 54
Grand Total 13.6 3.2 439 0.4 54

 

Historical operational perfomance of Akzhal Mine for 2005-2008 (tonnes)

 

  2005 2006 2007 2008
 Ore Mined 1,159,237 1,238,971 1,271,340 1,378,814
 Ore Processed 1,179,846 1,233,662 1,281,818 1,330,500
 Ore Grade Processed, %
 Zinc 2.52% 2.85% 2.54% 2.67%
 Lead 0.39% 0.68% 0.46% 0.54%
 Production (metal)
 Zinc 26,504 32,474 30,002 32,348
 Lead 3,797 6,953 4,785 5,747

Source: CZP, Akzhal Mine